CLS MGM CityCenter Shuttle
操作员 | MGM Mirage Design Group |
---|---|
位置 | Las Vegas, NV, 美国 |
斜长 | 650,0 m |
速度 | 37,8 km/h |
运量 | 3000 p/h |
旅程时间 | 60 sec |
火车 | 2 |
火车运量 | 132 |
站 | 3 |
The mega CityCenter complex in Las Vegas was opened on December 16, 2009 following a planning and construction phase of just three years. An integral part of this biggest privately financed development in US history is the Cable Liner Shuttle from Doppelmayr Cable Car. The 8-billion-dollar project encompasses 2,800 luxury condominiums, three casino-hotels with 5,000 hotel rooms and over 44,000 m² of shopping malls, restaurants and conference space – all linked by the local transit system from Doppelmayr Cable Car.
The Cable Liner Shuttle, with a transportation length of 650 m and a capacity of 3,000 passengers per hour and direction, connects the existing MGM Mirage casino-hotels "Monte Carlo" and "Bellagio" with an intermediate station in the heart of the CityCenter. The first Cable Liner Shuttle was built for the same customer in 1999 and since then has provided reliable and comfortable transport for over 250 million passengers. This is impressive proof that the system benefits such as simplicity, reliability and short project schedules, combined with the competence, flexibility and performance of the highly effective DCC team, are gaining exceptional recognition in the market.